CARGILL CORN MILLING FACILITY I SURVEYING SERVICES

 
 

Challenge:

McClure provided surveying services to assist in the conversion of an existing 370 acre ethanol production facility into a corn milling facility.

McClure Results:

McClure provided a range of survey services included legal surveys; photogrammetric control; establishing and maintaining a high accuracy project control network; producing topography base drawings for design; construction layout for paving, railroad tracks, buildings and utilities; vertical layout for steel erection and equipment installation; layout and as-builts for structural anchor bolts; and post–construction record utility drawings. With $500 million invested on this site, accurate and timely survey was a must.

The survey included 5 miles of yard railroad track, 5,000 construction layout data points, 5,500 as-built survey data points, 48 major equipment installations.

Location: Fort Dodge, Iowa
Client: Cargill
Expertise: Survey